Difference between revisions of "Pre and Post Test Data"

From LearnLab
Jump to: navigation, search
(User Story)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Status: Prioritization Needed'''
+
'''Status: In Progress'''
  
 
== User Story ==
 
== User Story ==
Line 7: Line 7:
 
== Notes/Comments ==
 
== Notes/Comments ==
  
* Describe your problem and what you need here. -- name date
+
* We have completed going through all the projects and studies documented the Theory Wiki to come up with a complete list of projects to date. Then we sent through that list to find the data in DataShop to determine if any pre/post test data has been attached.  On some pages, we added the new row in the summary table to indicate the state. See the [[Project Page Template and Creation Instructions|example page with instructions]] and the [[Hausmann Study]] for a real example. -- Spring 2011
* Easily sign your username and the current date/time by inserting four tildes (<nowiki>~~~~</nowiki>). -- [[User:Alida|Alida]] 10:38, 22 September 2009 (EDT)
 
  
 
<br>
 
<br>

Latest revision as of 14:29, 16 May 2011

Status: In Progress

User Story

As a researcher doing secondary analysis, I want to analyze the pre and post test data associated with the data set so that I can [achieve some goal].

Notes/Comments

  • We have completed going through all the projects and studies documented the Theory Wiki to come up with a complete list of projects to date. Then we sent through that list to find the data in DataShop to determine if any pre/post test data has been attached. On some pages, we added the new row in the summary table to indicate the state. See the example page with instructions and the Hausmann Study for a real example. -- Spring 2011



See completed DataShop 3.x Features
See on-going DataShop 4.x Features
See prioritized DataShop Feature Wish List
See unordered Collected User Requests